Engineering Spec Sheets


3 Wire 120/240 Volt Single Phase

4 Wire 120/208 Volt Three Phase

100 Amp Meter Pole Installation

200 Amp Meter Pole Installation

200 Amp Standby Generator Auto Transfer Switch (Complete Service)

200 Amp Standby Generator Manual Transfer Switch (Complete Service)

400 Amp Standby Generator Auto Transfer Switch (Complete Service)

400 Amp Standby Generator Manual Transfer Switch (Complete Service)

400 Amp Standby Generator Auto Transfer Switch (Partial Service)

400 Amp Standby Generator Manual Transfer Switch (Partial Service)

All AVECC Staking Specs & Docs

Building Mounted CT Cabinet for Overhead Service above 320 Amps

Building Mounted CT Cabinet for Underground Service above 320 Amps

CT Meter & Equipment Rack

Meter Base Mounted on CT Cabinet for Three Phase & 480 volt Single Phase

Location of Pad-mount Transformers from Buildings

Location of Pad-mount Transformers with Reduced Clearance from Buildings

Meter Pedestal Single or Three Phase Service up to 320 Amp

OH 600 Amp Standby Generator Auto Transfer Switch (Complete Service)

OH 600 Amp Standby Generator Auto Transfer Switch (Partial Service)

Overhead CT Meter & Equipment Rack Irrigation Service (3 Phase 7 480 volt Single Phase)

Overhead Meter on House Attachment to Wall or Fascia Single Phase 240 volt up to 320 A

Overhead Meter on House Mast Attachment Single Phase 240 volt up to 320 Amp

Pad-mount CT in Transformer Single or Three Phase Service

Small Load or Temporary Meter Pole Installation

Three Phase Transformer Concrete Pad

UG 600 Amp or Larger Standby Generator Auto Transfer Switch (Complete Service)

UG 600 Amp or Larger Standby Generator Auto Transfer Switch (Partial Service)

Underground Ditch Requirements

Underground Meter & Equipment Rack up to 320 Amps

Underground Meter on House Single Phase 240 volt up to 320 Amp (Residential ONLY)

Underground Temporary Pole Installation

Fiber Conduit Installation

NET Meter – Meter Pole Installation