Engineering Spec Sheets
3 Wire 120/240 Volt Single Phase
4 Wire 120/208 Volt Three Phase
100 Amp Meter Pole Installation
200 Amp Meter Pole Installation
200 Amp Standby Generator Auto Transfer Switch (Complete Service)
200 Amp Standby Generator Manual Transfer Switch (Complete Service)
400 Amp Standby Generator Auto Transfer Switch (Complete Service)
400 Amp Standby Generator Manual Transfer Switch (Complete Service)
400 Amp Standby Generator Auto Transfer Switch (Partial Service)
400 Amp Standby Generator Manual Transfer Switch (Partial Service)
All AVECC Staking Specs & Docs
Building Mounted CT Cabinet for Overhead Service above 320 Amps
Building Mounted CT Cabinet for Underground Service above 320 Amps
Meter Base Mounted on CT Cabinet for Three Phase & 480 volt Single Phase
Location of Pad-mount Transformers from Buildings
Location of Pad-mount Transformers with Reduced Clearance from Buildings
Meter Pedestal Single or Three Phase Service up to 320 Amp
OH 600 Amp Standby Generator Auto Transfer Switch (Complete Service)
OH 600 Amp Standby Generator Auto Transfer Switch (Partial Service)
Overhead CT Meter & Equipment Rack Irrigation Service (3 Phase 7 480 volt Single Phase)
Overhead Meter on House Attachment to Wall or Fascia Single Phase 240 volt up to 320 A
Overhead Meter on House Mast Attachment Single Phase 240 volt up to 320 Amp
Pad-mount CT in Transformer Single or Three Phase Service
Small Load or Temporary Meter Pole Installation
Three Phase Transformer Concrete Pad
UG 600 Amp or Larger Standby Generator Auto Transfer Switch (Complete Service)
UG 600 Amp or Larger Standby Generator Auto Transfer Switch (Partial Service)
Underground Ditch Requirements
Underground Meter & Equipment Rack up to 320 Amps
Underground Meter on House Single Phase 240 volt up to 320 Amp (Residential ONLY)